ATOMIC ENERGY COMMISSION
re
~ "SANTA FE OPERATIONS OFFICE
AS-BUILT DRAWING NUMBERS AND DATES:
FS-132
2/10/52
JOB NO.
640 = 5j
:
CONTRACT NO.
For:
or:
SMM
.
-
COMPLETION REPORT FOR
AOMOM, BIIJIRI, ROJOA,
AT—(29-¢)-507__
Not for use by AE
LOCATION & EBERIRU GROUP - SITES "D-V" DATE OF THIS REPORT:
The e € Complete
|
Constructl
Construction o t Sewer Lines
10 February 1951
Building No.:
ESTIMATE
“Property
Account
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
Construction
Contract
Est'd.
Vatue
Goverurnlsned
Engl
gineering
Cost
Total
$741.86
$11,615.76
SEWER LINES
The sewer lines consist of 750 feet of 8" V.C. pipe and four manholes, 200 feet
of 6* ¥.C. pipe, and a 220 foot outfall of 6" eorrugated metal pipe.
Other piping shown on this drawing includes 150' of 2" G.I. pips = fuel tank
drain, 150 of 2" brass pipe - motor cooling water, 60' of 1" pipe to the salt
Water well, and 90' of 2" pipe - water tower to pit.
1
Rach
Direct
Indirect
$9,410.16
4h63-7h
.
Proration of
Charges
to Units