“
Reproduced from the holding: of the National Archives
HOLMES &NARYERY dai Bester
FAGINEERS Co NS TREC
TO:
22
FROM:
W, C, Chenoweth
VY. G, Gunneli
JOR
ep
/ :
6)
-
ou
.
Chapel a
jf
bel,
Hof
(
‘ars
ae
sate
May
al,
1955
Normal lead time for procurement for this building would require an AME or B/M
to have been issued prior to this date, There does not appear to be any material
required for this structur- which should not be available at Jobsite,
Since construction is scheduled to start or Jul 1, 1953, delivery of any items
procurred stateside should »o-. made by Juze cary vessel, which would require
immediate requisitioni ic,
wes
Ab
¢ é
t
grt vane
“
1 Ales,
Vv, ¢G, Gunnell
vcG; drf
ec:
D, L, Narver, jr.”
J, H, Manning
C, L, Coray
Control Sectior
Req'n, Section
SOM
8-82 MAG
_