ives.
of the National Arch
Reproduce d from the holdings
Pacific Southwest Regyon
: es
CoP
at

.
bee

iy ftp ed
es

~

Te

S P HOWELL

Tease 2 ES TE AQBD

David L. Narver, Jr.

Surveys

March 6, 1953

In addition to the surveys that we have asked you to
undertake, the following islands will also be needed?
Able, Charlie, Victor, William, Yoke, Zebra, Alfa
and Bravo
The survey of these islands is secondary to triangulation,
The order at the present time may be determined by the
field.

Devid L. Narver, dre

DINJrreas

ec:

Chief Project Engineer

-

JS Chrono

Constre-Oper, Dive

wat nh

bey tees

Project Engr. File!

Engineering File

Co

Le So Hammond

816 Mail Room (2)

e
UaSti faeo
YBRE

ERG
F
T OFCH
iT
QEPARTMENO

Oy
VAUTHORED
SINGLE REVIE we
co fast
00)
REVIEWERS

NAME:
DATE:

ee!

A

entice

|

ee

cycy cota

See.

ee

nee

EAS
HUMHEASH
Re LANES
DEFERM
ICATION(eikcut
ORNATION

O TO.
7CLASSIFICATION CHANGE
CLASSIFIED ihFO

3. CONTAINS NG DOE
e
OORDINATE WITH. e
LASSIFICATION CANCELLED
.
;
“CLASSIFIED INFO BRAC KETEG

ere wee

ae

mtaeyd

tara Bes
_

a

Select target paragraph3