HICKAM AFB
F&SNO.
TITLE
SCIENTIFIC AND SUPPORT
07002
Trailer Park and Trailers
USER
STRUCTURE ‘FACILITY NO.
JTF
SCIENTIFIC STATION NO.
None
goo
None
FoD GO+30
FUNDING
AGENCY
AEC
($000)
ENGR
PROC
44.9
24.9
53.8
60. 0
CONST
TOTAL
FURN
871.0
173.1
969.7
258.0
48.1
6.3
6.3
1050.4
1234.0
PRE-GO
Prior Cost
FY 71
POST-GO
Est. 3/69
|; TOTAL
09.8
113.8
48. 1
IN ORDER TO MEET THE REQUIRED FULI. OCCUPANCY DATE OF GO+30,
ENGINEERING AND PROCUREMENT MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS
ENGINEERING
Drawings:
F
F
F
F
F
Completed.
JS
JS
JS
JS
JS
JS
JS
JS
JS
JS
JS
95-058-C2 thru C5
95-058-AT
95-058-A3 thru A5
95-058-A8 thru A2O
95-058-Az3
95-058-E17 thru E25
95H-058-A10 thru Al3
95H-058-EF2 thru E7
95H-058-E9
95H-058-E11 thru El7
95H-~-058-E19
95-058-C1 and C2
95-058-E2
95-058-E6 thru Ell
95-058-X2
95H-058-C2 thru C4
95H-058-A2 thru A24
95H~-058-C6 and C8
95H-058-C13 thru C15
95H-058-M1 thru M3
95H-058-M6 thru M8
95H-058-E2 and E5
PROCUREMENT Completed.
CONSTRUCTION A secure trailer compound and technical trailer park are located near the Diagnostic Aircraft Parking Area. A chain link fence forms the
boundary between the two paved areas. Area lighting and a guard shack are
provided. The north, east and part of the south side of the Technical Trailer
Park are fenced with a 7-ft. high wooden fence. The balance of the Technical
Trailer Park and all of the secure trailer compound are enclosed by grounded,
7-ft. high chain link fence topped with barbed wire outriggers.
The Trailer Docks are connected by covered,
elevated, wooden walkways.
A
freshwater line, sanitary sewer, anda photo waste sewer system are provided.
Incoming overhead power of 11.5 kv is reduced in voltage by a substation
7-1
VOL II
q