FaswNO. TITLE 05017 Damon-Tract Study USER STREGTURE /PACILITY NO. AEC FUNDING AGENCY AEC Pet~ SCIENTIF‘C STATION NO. - None so None ($000) ENGR PROC CONST FOO TOTAL PRE-GO Prior Cost FY 69 11.3 1.0 11.3 TOTAL 12.3 12.3 FURN PRIOR YEARS ENGINEERING STUDY A study is in progress to develop a plan for the use ofa. .* Damon Tract type complex at some location not yet designated. Decisions have ~~ not been reached by the State of Hawaii, Department of Transportation regarding its proposed action to utilize the Damon Tract Area as part of the Honolulu Inter national Airport Complex. F&S Item numbers will be assigned to each facility or project as planning is authorized. * FY 1969 ENGINEERING STUDY in FY 69. The subject study has been authorized for continuation This study is to include an optimum AEC/HAOfacility and alternate sites proposed by the State of Hawaii, Department of Transporation. 5-13 VOL I

Select target paragraph3