FaswNO.
TITLE
05017
Damon-Tract Study
USER
STREGTURE /PACILITY NO.
AEC
FUNDING
AGENCY
AEC
Pet~
SCIENTIF‘C STATION NO.
- None
so
None
($000)
ENGR
PROC
CONST
FOO
TOTAL
PRE-GO
Prior Cost
FY 69
11.3
1.0
11.3
TOTAL
12.3
12.3
FURN
PRIOR YEARS
ENGINEERING STUDY A study is in progress to develop a plan for the use ofa.
.*
Damon Tract type complex at some location not yet designated. Decisions have
~~
not been reached by the State of Hawaii, Department of Transportation regarding
its proposed action to utilize the Damon Tract Area as part of the Honolulu Inter national Airport Complex. F&S Item numbers will be assigned to each facility or
project as planning is authorized.
*
FY 1969
ENGINEERING STUDY
in FY 69.
The subject study has been authorized for continuation
This study is to include an optimum AEC/HAOfacility and alternate
sites proposed by the State of Hawaii, Department of Transporation.
5-13
VOL I