Page Zos
Ciayells & 2 oat

a.

—_—

ee my eted gammacalibration well ig locatedinthe,
cali:

ail Oefee

eet. 4-in.” square reinforced conc reta”*coHae énttecien:

eter stégeBipe which serves as the outer casing of the well. The'c
-- ‘to 1-ft. Sfiove finishedfloor grade;whencompleted, itwill be3-ft.|.
-floor grade.

The inner cating is a I0-in. diameter steelpipe
whichSais

The space between the inner and outer casings is filled wit

below grade.

a

2

j

we

nee

FY

1969

2°?

wh

fd

Pa

ENGINIEERING Com pleted.
N mnmane

te

Say

ay

S
Ree a eae ned. enen

.-PROCUREMENT. The lead shot. wel.
lining,idetrument,©electrical controls, |4
chill box, and shelving will be pracured.

fa EY PONE

”

~

CONSTRUCTION Completion of this facility prior to 9-1-69 entails the inetalla<4/
tion of lead shieldingin the calibration well; completios flee: cones
and installation of the calibration instrument mechanism and electrica
Also, shelving and storage Bins’ will be: instalied and a‘chill boxfor thes
of crated film badgeswillbeplaced in the rad safe supply. rooms." a
%
sEC

wd

-

ricttete ety

po

a

“y

een

eee

7

eH OE BOT ED ly tolet de. ster so wT POET oan ceed
eS Poterie ate
“hin wit-te .. Be rk OE
‘Ga 7 af
,Oeteseaqs mee on Fi utes ' dele tec! FST:
roe
OU Orgaear SIBiSe wel adBo
coctieee ois aeSyage bw Pole bagel

.

atest slekieie die!

Jinh 2) BEULiso as wevoas-pemigct ie oslt wo td got

> Sm.sTetilesadetre ytiiss: iat nett sicufhseptige|4
sngmeie meDAE aptiniggs wpbcasamecaermeer: bing regkd %

ie ote: i err3aE T wha anigmen> gt Mabie:aaha
Eb 7mgu1 wobse:, {82 Ray
4)tet eRts2 coP std las
OER PAS oro, 1: dey “Mes & bas He GE reget:

a# Se OfT
”

+

ctsus So ots asaditigse & tan cic. LA
“
ey
eda. gawd Lt

1 at

.

t

ae

vtah ce vd beBibermetas tan poroltthacs teas
yecbdine ou tir es

smi, & sh RO GB
rotete say]

tiny BCSLOAG wi RC HBtud ede: befiqaue * - ae

oisbs ud sn acivese sil«dere Bios kas. ew
Tae) ag beseic me SF OE Bs 18S

ome
VOL Il

,

,

5#1@

q
.

;
,

Select target paragraph3