SOON,
VITI LEVU, FIJI
Fa&SNO.

TITLE

27005

Camp

USER

STRUCTURE /FACILITY NO.

SCIENTIFIC STATION NO.

None

None

JTF-8

Bop
FOO GO+120

FUNDING

AGENCY

($000)

ENGR

PROC

CONST

TOTAL

JTF -8/

PRE-GO

CRO 7-65

POST -GO
Estimate 12/65*

210.0

210.0

TOTAL

210.0

210.0

MILCON

FURN

Engineering costs included in F&S Number 22007.

IN ORDER TO MEET THE REQUIRED BENEFICIAL AND FULL OCCUPANCY
DATES AND MAINTAIN AN ORDERLY MOBILIZATION OF OFF-ISLAND CAMP
CONSTRUCTION, PROCUREMENT FOR THE ACCEPTED CAMP CONCEPT
MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS

ENGINEERING Plan IIIB Preliminary Drawings - Completed.
Drawings:

93-002-Cl
93-023-Al
93-024-Al

PROCUREMENT
at Damon Tract.

93-043-Al, Ml and El
93-078-Cl
93-095-El and E2

106-002-Cl
TYP-035-Al and A3
TYP-036-Al

Some major items for Plan IIIB type camps are in stockpile

CONSTRUCTION Will be accomplished Post-GO.
POST-GO
ENGINEERING Plan HIB Preliminary Drawings - Completed.

If military

field camp concept is adopted, engineering will be completed in the field, PostGO.
PROCUREMENT Should be accomplished Pre-GO.
CONSTRUCTION A tent camp will be required for billeting and messing
scientific and support personnel. JTF-8 is currently reviewing support
camp requirements and material costs.

*Includes mobilization and demobilization costs based on Plan IIIB concept.
27-7

s oe hie a

VOL II

April 1969