HF Communications Simulation Experiment - Subtask A611

TC

None

106-3-2

FODGO+125
TOTAL

CONST

PROC

ENGR

($000)

FUNDING
AGENCY

BODGO+105

SCIENTIFIC STATION NO.

FURN

DASA/
PRE-GO
RDT&E
Engineering costs included in F&S Number 21003
EAO 1106-| POST -GO
4101-61
Estimate 12/65
8.3
8.3
8.3

8.3

TOTAL
PRIOR YEARS
ENGINEERING

Completed.

Drawing:

106-002-Cl

POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION Test Command furnished items are as follows: a) one 110-ft.
high Log Periodic Ionospheric antenna; and, b) one instrument trailer. The
contractor will furnish two 20 kw,

120/240 volt,

speed (1250 rpm) diesel generators.
up power source.

60 cycle,

single phase,

low

One of the generators is utilized as a back

The contractor will perform the following;

a) prepare a cleared, flat, 265 x 345-

ft. unobstructed area for the TC erected 110-ft. high Log Periodic lonospheric
antenna which will have a ground screen that extends into the sea; b) construct
concrete antenna bases, as designed by TC in the field;

pads and anchors for the antennas;

c) provide longeron

d) site the instrument trailer; and,

e) install

the generators and complete the electrical hookup to the instrument trailer. A
site on Saweni Beach at the town of Lautoka has been leased; referto Figure A-24,
Appendix A,

for site location.

The five scientific personnel assigned to Subtask

A611 will live off the local economy and also operate Subtask A628.