Ganneaeee
UPOLU
F &S NO.

TITLE

26006

Camp

USER

STRUCTURE/FACILITY NO.

JTF -8

SCIENTIFIC STATION NO.

None

Bop

None
FOD GO+120

FUNDING

AGENCY

JTF-8/

MILCON

($000)

ENGR

PROC

CONST

TOTAL

FURN

PRE-GO

Engineering costs included in F&S Number 22007.

CRO 7-65] POST-GO
Estimate 12/65*

212.1

212.1

TOTAL

212.1

2iz.l

IN ORDER TO MEET THE REQUIRED BENEFICIAL AND FULL OCCUPANCY
DATES AND MAINTAIN AN ORDERLY MOBILIZATION OF OFF-ISLAND CAMP
CONSTRUCTION, PROCUREMENT FOR THE ACCEPTED CAMP CONCEPT
MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS

ENGINEERING Plan IIB Preliminary Drawings - Completed.
Drawings:

93-002-Cl
93-023-Al
93-024-Al

93-043-Al, Ml, El
93-078-Cl
93-095-El] and E2

121-002-Cl
TYP-035-Al and A3
TYP-036-Al

PROCUREMENT
at Damon Tract.

Some major items for Plan IIIB type camps are in stockpile

CONSTRUCTION

Will be accomplished Post-GO.

POST -GO
ENGINEERING Plan NIB Preliminary Drawings ~ Completed. If military
field camp concept is adopted, engineering will be completed in the field, Post-

GO.

PROCUREMENT

Should be accomplished Pre-GO-

CONSTRUCTION A tent camp will be required for billeting and messing
scientific and support personnel. JTF-8 is currently reviewing support
camp requirements and material costs.

*Includes mobilization and demobilization costs based on Plan IIIB concept.
26-8

CORE,

VOL II

Aprth 1909