UPOLU
F &S NO.

26004

TITLE

HF Communications Simulation Experiment - Subtask A611

USER

STRUCTURE “FACILITY NO.

TC

None

SCIENTIFIC STATION NO.

BOD GO+105

121-3-4
ENGR

PROC

CONST

FOOD GO+125

($000)

DASA

PRE -GO

EAO 11064
4101-61

POST-GO
Estimate 12/65

8.3

8.3

TOTAL

8.3

8.3

RDT&E

FURN

TOTAL

FUNDING
AGENCY

Engineering costs included in F&S Number 21003

PRIOR YEARS
ENGINEERING

Completed.

Drawing:

121-002-Cl
POST-GO

PROCUREMENT

To be accomplished.

CONSTRUCTION

Test Command furnished items are as follows:

a)

one

110-ft.

high Log Periodic Ionospheric antennas; and, b) one instrumenttrailer.
The
contractor will furnish two 20 kw, 120/240 volt, 60 cycle, single phase, low spee
(1250 rpm) diesel generators.

One of the generators is utilized as a back up

power source.
The contractor will perform the following: a) prepare a cleared. flat 180 x 370ft. unobstructed area for the TC erected 110-ft. high Log Periodic lonospheric

antennas which will have a ground screen that extends into the sea; b) construct
concrete antenna bases, as designed by TC in the field;

and anchors for the antennas;

c) provide longeron pads

ad) site the instrument trailer; and e) install the

generators and complete the electrical hookup to the instrument trailer. The site
location will be selected after a reconnaissance by the project officer. Refer to

Figure A-23, Appendix A. for general location.

The five scientific personnel

assigned to Subtask A611 will also operate Subtask A628 at this location.

VOL II
April 1969

26-6