eee
UPOLU
F&S NO.

26001

TITLE

Measurement of Gamma, Neutron, and Visible Radiation from

Fission Debris - Subtask A615

USER

STRUCTURE /FACILITY NO.

SCIENTIFIC STATION NO.

TC

None

121-3-1

BOD cO+122
FOOD GO+152

FUNDING
AGENCY

($000)

ENGR

DASA/
RDT&E

PRE-GO
Prior Cost

EAO 1106-|

POST-GO

4101-61

PROC

CONST

TOTAL

1.3

1.3

Estimate 12/65

TOTAL

FURN

1.3

31.1

31.1

31.1

32.4

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

121-002-Cl

121-3-1-Ci and El
POST-GO

PROCUREMENT
ft.

To be accomplished.

Contractor will also provide 10,000 cu.

of (STP) helium.

CONSTRUCTION

Test Command furnished items are as follows:

ment trailers; b) eight (8) 60-ft.

a} two instru-

antennas; c) balloon launch instrumentation;

and, d} optical instrumentation. The contractor will perform the following: a)
erect a combination office laboratory, 16 x 32-ft. wood frame tent, supplied
with 5 kw,

electrical power; b) provide each of the two instrument trailers with

20 kw electrical power; c) construct eight (8) 4 x 4x 1/2-ft. concrete pads and
d) erect the TC 60-ft. antennas on the completed pads. The total electrical
installation requires two contractor furnished 50 kw,

single phase generators.
source.

120/240 volt,

60 cycle,

One of the generators is utilized as a back up power

The antenna area will be located at a minimum of 3 miles from the Subtask
A616 site. The contractor will prepare level areas for the balloon launch facilities, optical facilities and the antenna area. The optical area will havea
line-of-sight in a horizontal azimuth from northeast to south-southwest. If
optical and antenna areas are not tied together electrically, separate back up
generators will be required. A site will be selected after the project officer
has made a field reconnaissance of the area shown in Figure A-23, Appendix
A. Three scientific personnel will be assigned to A615 at this location.
*Includes engineering costs for F&S No. 27003.

26-3

SECT,

VOL I

om