COPELSata

PALMYRA
F&S NO.

25011
ITE -8

TITLE

Communication Center

(U. S. Army Strategic Communication Command)

STRUCTURE
'F
Y NO.
None
0

|
TON
eee None
0 NO.
0

BoD GO+23

FOR GO+30
FUNDING
AGENCY

JTF
MILCON
CRO7-65

($000)

ENGR

PROC

CONST

TOTAL

FURN

PRE-GO
Engineering costs are included in F&S No, 22009.
POST-GO
Construction cost estimate included in F&S No.

25010.

PRIOR YEARS
ENGINEERING
Drawings:

Completed,
TYP-035-Al and A3
TYP-036-Al

101-002-C6
101-038-Cl and El

POST -GO
PROCUREMENT

To be accomplished

CONSTRUCTION

The U. S. Army Strategic Communication Command will

furnish 3 communication vans.

The contractor will construct a 20 x 20-ft.

concrete pad for siting the communication vans.
The Communication Center will share the maintenance and joint operations
tents with the U. S. Air Force Air Weather Service facility (F&S No. 25010).

The joint installation is located about 2000 yards northwest of the aircraft

landing strip at the old ship pier. Refer to Figure A-22, Appendix A, for
site location. Transmitting, receiving and cryptographic service will be
provided to all agencies located on this island. One officer and 25 EM from
a Provisional Army Signal Unit (PASU),

Team A-2, will operate the communi-

cation center at this location.

VOL II

April 1969

25-12