PALMYRA
Fa&S NO.

TITLE

25007

Camp

USER

STRUCTURE/FACILITY NO.

JTF-8

None

FUNDING
AGENCY

JTF-8
MILCON
CRO 7-65

SCIENTIFIC STATION NO.

($000)

BOD

None
ENGR

PROC

CONST

GO+23
FOD GO+30

TOTAL

FURN

PRE-GO
Engineering costs included in F&S Number 22007.
POST-GO
Estimate 12/65%*
210.1
210.1
TOTAL

210.1

210.1

IN ORDER TO MEET THE REQUIRED BENEFICIAL AND FULL OCCUPANCY
DATES AND MAINTAIN AN ORDERLY MOBILIZATION OF OFF-ISLAND CAMP
CONSTRUCTION, PROCUREMENT FOR THE ACCEPTED CAMP CONCEPT
MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS
ENGINEERING
Drawings:

Plan IJIB Preliminary Drawings - Completed.

93-002-Cl1
93-023-Al
93-024-Al

PROCUREMENT
at Damon Tract.

93-043-Al, Mi and El
93-078-Cl
93-095-El1 and E2

101-002-C6
TYP-035-Al and A3
TYP-036-Al

Some major items for Plan IIIB type camps are in stockpile

CONSTRUCTION Will be accomplished Post-GO.
POST -GO
ENGINEERING Plan IIIB Preliminary Drawings - Completed.

If military

field camp concept is adopted, engineering will be completed in the field, Post-

GO.

PROCUREMENT Should be accomplished Pre-GO.
CONSTRUCTION A tent camp will be required for billeting and messing
scientific and support personnel. JTF-8 is currently reviewing support
camp requirements and material costs.

*Includes mobilization and demobilization costs based on Plan IIIB concept.

25-7