(inbiiinitin,

PALMYRA
F &S NO.
TITLE
25003
HF Communications Simulation Experiment - Subtask A611
USER

TC

STRUCTURE, FACILITY NO.

FUNDING

($000)

AGENCY

DASA

SCIENTIFIC STATION NO.

-

BooGO~ 10>

101-3-3

None

ENGR

PROC

CONST

TOTAL

FURN

PRE-GO

RDT&E
Engineering costs included in F&S Number 21003
EAO 11064 POST-GO

4101-61

FOO GO+125

Estimate 12/65

TOTAL

8.3

8.3

8.3

8.3

FRIOR YEARS
ENGINEERING

Completed.

Drawing:

101-002-C6

POST -GO
PROCUREMENT

To be accomplished.

CONSTRUCTION Test Command furnished items are as follows: a) one 110-ft.
high Log Periodic Ionospheric antenna; b}) one instrument trailer; and, c) one
8 x 22-ft.

camper trailer.

The contractor will furnish two 20 kw,

60 cycle, single phase, low speed (1250 rpm) diesel generators.
generators 1s utilized as a back up power source.

120/240 volt,

One of the

The contractor will perform the following; a) prepare a cleared, flat, 230 x 370ft. unobstructed area for the TC erected 110-ft. high Log Periodic Ionospheric
antennas which will havea ground screen that extends into the sea; b) construct
concrete antenna bases, as designed by TC in the field; c) provide longeron
pads and anchors for the antennas; d) site the instrument trailer and camper
trailer; and, e) install the generators and complete the electrical hookup to
the instrument trailer. Refer to Figure A-22, Appendix A, for site location.
The four scientific personnel assigned to Subtask A611 will also operate the
Subtask A628 facility at this location.