cs
MIDWAY

F&SNO.

TITLE

24007

HF Communications Simulation Experiment - Subtask A611

USER

STRUCTURE-FACILITY NO.

SCIENTIFIC STATION NO.

BOD

112-3-7

None

TC

GO+105

FOD GO+125
FUNDING
AGENCY

DASA/
RDT&E
EAO 1106-|
4101-61

000
($000)

N
ENGR

PROC

CONST

TOTAL

FURN

PRE-GO
Engineering costs included in F&S Number 21003
POST-GO
Estimate 10/65
8.3
8.3
TOTAL

8. 3

8.3

PRIOR YEARS
ENGINEERING

Completed

Drawing:

112-002-Cl

POST -GO
PROCUREMENT

To be accomplished

CONSTRUCTION The Navy Public Works Department will probably perform
the majority of work. Test Command furnished items are as follows: a) one
110-ft. high Log Periodic Ionospheric antennas; and,
b) one instrument trailer.
If local power is not available two 20 kw, 120/240 volt, 60 cycle, single phase,
low speed (1250 rpm) diesel generators are required. One of the generators
is utilized as a back up power source.
The Navy Public Works Department will perform the following:
cleared, flat,

a) prepare a

310 x 320-ft. unobstructed area for the TC erected ]10-ft.

high

Log Periodic lonospheric antennas which will have a ground screen that extends into the sea; b) construct concrete antenna bases, as designed by TC
in the field; c) provide longeron pads and anchors for the antennas; d) site
the instrument trailer; and,
e) install the generators and complete the elec-~
trical hookup to the instrument trailer. Refer to Figure A-21, Appendix A,

The four scientific personnel assigned to Subtask A6)]) will
also operate the Subtask A628 facility at this location.

for site location.

24-7

VOL II
April 1969