FRENCH FRIGATE SHOALS
F & S NO.
TITLE
22007
Camp
USER
STRUCTURE /FACILITY NO.
JTF-8
SCIENTIFIC STATION NO.
None
None
BOD GO+e3
Foo GO+30
FUNDING
AGENCY
{$000)
JTF-8/
PRE-GO
CRO 7-65}
POST-GO
MILCON
ENGR
PROC
CONST
Prior Cost* 14.9
FURN
14.9
Estimate 12/65**
TOTAL
TOTAL
14.9
205.1
205.1
205.1
220.0
IN ORDER TO MEET THE REQUIRED BENEFICIAL AND FULL OCCUPANCY
DATES AND MAINTAIN AN ORDERLY MOBILIZATION OF OFF-ISLAND CAMP
CONSTRUCTION, PROCUREMENT FOR THE ACCEPTED CAMP CONCEPT
MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS
ENGINEERING
Drawings:
Plan HIB Preliminary Drawings - Completed.
93-002-Cl and C2
93-023-Al
93-024-Al
93-043-Al, El, Ml
93-078-Cl
93-095-El and E2
TYP 035-Al and A3
TYP 036-Al
PROCUREMENT
at Damon Tract.
Some major items for Plan Ili B type camps are in stockpile
CONSTRUCTION
Will be accomplished Post-GO.
POST -GO
ENGINEERING Plan IIIB Preliminary Drawings - Completed.
If military
field camp concept is adopted, engineering will be completed in the field, Post-
GO.
PROCUREMENT Should be accomplished Pre-GO.
CONSTRUCTION A tent camp will be required for billeting and messing scientific and support personnel.
ments and material costs.
JTF-8 is currently reviewing support camp require-
*Includes engineering costs for F&S Numbers 21010, 25007, 26006 and 27005.
** Includes mobilization and demobilization costs based on Plan IIIB concept.
CU
22-8
VOL II
April 1963