CU
FRENCH FRIGATE SHOALS
FaSNO.
22001
TITLE
Debris Tracking by Resonant Scattering Equipment - Subtask A606
USER
STRUCTURE ‘FACILITY NO.
TC
FUNDING
AGENCY
DASA/
RDT&E
EAO 1106-{|
4101-61
SCIENTIFIC STATION NO.
None
($000)
ENGR
BoD
93-3-1
PROC
CONST
TOTAL
GOr138
FOOGO+159
FURN
PRE-GO
Engineering costs included in F&S Number 21001.
POST-GO
Estimate 12/65
| TOTAL
8.9
8.9
8.9
8.9
PRIOR YEARS
ENGINEERING Completed.
Drawings:
93-002-C2
93-3-1-Cl
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION A technical operations shelter will be required to provide
office and recording instrument space. This building will be 8 x 8-ft. of wood
frame construction with plywood siding, and corrugated aluminum roof and
erected on a concrete slab. It will be air conditioned and dehumidified to 50
percent humidity. A 6 x 6-ft. concrete pad 18-in. thick will be constructed
about 20-ft. from the building for mounting TC furnished camera equipment.
Electric power, including back up, will be provided by two 5 kw, 120/240 volt,
60 cycle, single phase generators.
Refer to Figure A-19, Appendix A, for site
location. The number of scientific personnel assigned to Subtask A606 at this
location is one.
22-3
VOL Il
April 1969