CANTON
F&SNO.

TITLE

21007

Riometer Station - Subtask A628

USER

STRUCTURE FACILITY NO.

SCIENTIFIC STATION NO.

None

TC

BoD

108-3-7

GO+105

FoDGO4+135
FUNDING

($000)

DASA/

PRE-GO

AGENCY

RDT&E

ENGR

PROC

CONST

Prior Costs* 2.2

EAO 1106-|
4101-61

TOTAL

FURN

2.2

POST-GO
Estimate 12/65

19.1

19.1

TOTAL

19.1

21.3

2.2

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

108-002-C2

108-3-7-Al, Cl and El

POST-GO
PROCUREMENT

To be accomplished.

CONSTRUCTION Test Command will furnish the following equipment: a) one
30 and 90 mc oblique antenna; b) one 30 mc Riometer antenna; c) one 90 mc
Riometer antenna; d) one 27 mc Radar antenna;

f) one air conditioning unit.

e) one instrument van; and,

The contractor will furnish one storage CONEX.

Power requirements are 10 kw, 120/240 volt, 60 cycle, 3 phase, plus 100%
backup.

This requirement will be served by utilizing tne generators listed

under Subtask A609 (F&S No. 21002).

The contractor will perform the following: a) provide a cleared, flat, unobstructed area approximately 75 x 150~-ft.; b) site the instrument van and the
storage CONEX in the vicinity of the Test Command antennas; and, c) install

the generators and complete the electrical hookup to the instrument van. Refer to Figure A-18, Appendix A, for site location. Scientific personnel assign-

ed to Subtask A609 will operate this Subtask Ao28 facility.

*Includes engineering costs for F&S Numbers:

27004 and 27005.

21-7

22004, 24008, 25005, 26003,

Ret ‘

VOL II

April 1969

Select target paragraph3