eer.
KAUAI,

AEC-TRFE

F &S NO.

SUPPORT

TITLE

12008

Roads

USER

STRUCTURE FACILITY NO.

JTF

SCIENTIFIC STATION NO.

None

Bop

None
FOD

FUNDING
AGENCY

($000)

AEC

ENGR

PRE-GO

Prior Cost

PROC

CONST

Cost included in F&S No.

TOTAL

FURN

11024

POST-GO
Estimate

TO BE DETERMINED

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

F 97-002-Cl thru C4

97-3224B-C2 thru C4

JS 97-3224C-Cl
thru C5 and C7

PROCUREMENT

Completed.

CONSTRUCTION

The main entrance road to the AEC-TRF is approximately

1 1/2 miles long and is composed of asphaltic concrete varying in thickness
from 11/2 to 3 inches. The roadway widthis 20-ft. Guardrails and warning
Signs are installed alongside the road, where needed.
A 50-ft.

(Completed in 1965.)

long sheet pile retaining wall is provided where the roadbed passes

over a drainage canal.
bedded in the roadbed,

Water is pumped across the road through a pipe em-

Stabilized coral roads branch from the main road to the AME Field and to the
Rawidar Trailer Dock.

A stabilized coral road extends east-west along the

southern border of the launch complex and extends to Balloon Release Station
No.

2,

POST -GO
ENGINEERING

To be accomplished.

PROCUREMENT

To be accomplished.

CONSTRUCTION

Access roads will be installed to the Post-GO launch pads

and Rocket Motor Staging and Holding Area.

12-6

VOL II

Select target paragraph3