KAUAI, AEC-TRF
11023

SCIENTIFIC
Page 4

ing the roof of the Conference Trailer will be strengthened.
D.

Air Conditioning Modifications
Existing air conditioning units in the Signal Cable Shelter and in the Telephone Equipment Van will be replaced by a single unit which will serve
both.

E.

New Trailers
Four (4) Sandia furnished trailers, each 10 x 50-ft. in size and each air
conditioned, will be placed within the trailer compound and will be provided with utilities.
The trailers areidentified as follows:
Trailer NO.

B-29

Use/ Name

Payload Control

B-57
B-58

Office
Payload Checkout Lab.

B-65

Payload Checkout Lab.

An H&N Communications Trailer will also be placed at the trailer dock
and provided with utility connections.

FY 1971
ENGINEERING

To be accomplished.

PROCUREMENT

To be accomplished.

CONSTRUCTION Three (3) AEC furnished office/laboratory trailers for LASL's
use will be placed within the trailer compound and will be provided with utilities.

The required FOD is GO+60.

POST -GO
ENGINEERING

To be accomplished.

PROCUREMENT

To be accomplished.

CONSTRUCTION One (1) EG&G furnished Timing Trailer will be placed within

the AEC-TRF Secure Trailer Compound and will be provided with connections to
utilities and to the signal cable system. The required FOD is GOt+60.
VOL II

Select target paragraph3