KAUAI, AEC-TRF 11023 SCIENTIFIC Page 4 ing the roof of the Conference Trailer will be strengthened. D. Air Conditioning Modifications Existing air conditioning units in the Signal Cable Shelter and in the Telephone Equipment Van will be replaced by a single unit which will serve both. E. New Trailers Four (4) Sandia furnished trailers, each 10 x 50-ft. in size and each air conditioned, will be placed within the trailer compound and will be provided with utilities. The trailers areidentified as follows: Trailer NO. B-29 Use/ Name Payload Control B-57 B-58 Office Payload Checkout Lab. B-65 Payload Checkout Lab. An H&N Communications Trailer will also be placed at the trailer dock and provided with utility connections. FY 1971 ENGINEERING To be accomplished. PROCUREMENT To be accomplished. CONSTRUCTION Three (3) AEC furnished office/laboratory trailers for LASL's use will be placed within the trailer compound and will be provided with utilities. The required FOD is GO+60. POST -GO ENGINEERING To be accomplished. PROCUREMENT To be accomplished. CONSTRUCTION One (1) EG&G furnished Timing Trailer will be placed within the AEC-TRF Secure Trailer Compound and will be provided with connections to utilities and to the signal cable system. The required FOD is GOt+60. VOL II