— CORB
KAUAI, AEC-TRE
F&SNO.

11010
USER

SCIENTIFIC

TITLE

Launchers
STRUCTURE. FACILITY NO.

Sandia

SCIENTIFIC STATION NO.

See Text

BOD

See Vol. Ill
FOOGO+120

FUNDING
AGENCY

AEC

($000)

ENGR

PRE-GO
Prior Cost

PROC

2.0

POST -GO
Estimate

CONST

TOTAL

102.0

104.0

FURN

TO BE DETERMINED

TOTAL

2.0

102.0

104. 0

PRIOR YEARS
ENGINEERING
Drawings:

Completed.

97.-3224B-C2 and C3
97-3224B-We
97-3225-S]
97-080-El

PROCUREMENT

JS 97-002-Cl and C2
JS 97-3224C-E7
JS 97-3224C-Cil thru C5
JS 97-3251A-E2 and E3
FO97-097-E}

F97-002-Cl
F97-027-E2andE4
F97-080-E4
F97-086-Cl thruC4
F 97-086-E]1

Completed.

CONSTRUCTION Fourteen (14) launch pads with ten (10) launchers are in place
at the AEC-TRF (completed in 1965).
HAD Launchers:

Nos.

8,

HAD Launch Pads Only:

9,
Nos.

10,
17,

11,

12,

13,

14 and 16.

18 and 20,

Universal Launchers: Nos. 15 and 19.
Universal Launch Pad Only: No. 23.

Universal launcher foundations can withstand a 500, 000 foot-pound overturning
moment and concentrated loads of 2-tons 60-inches apart. HAD launcher
roundations can withstand a 50, 000 foot-pound overturning moment and concentrated loads of |-ton 40 inches apart. Generators are the primary source
of power to the launchers with commercial power functioning as back up,
through an automatic transfer switch. Signal cable trom each launcher terminates at a signal cable shelter (Building 675) in the Secure Trailer Compound.
POST -GO
ENGINEERING
PROCUREMENT

To be accomplished.
To be accomplished.
11-7

were

VOL Il

Apeit tee

Select target paragraph3