HICKAM AFB
FaS NO.

SCIENTIFIC AND SUPPORT

TITLE

07039

Rehabilitate Building 7 at Bishop» Point

USER

STRUCTURE FACILITY NO.

TG 8.4

;

FUNDING
AGENCY

JTF/
MILCON

SCIENTIFIC STATION NO.

7
($000)

BoD

None
ENGR

PROC

PRE-GO
Prior Cost

FOD

CONST

TOTAL

65.1

65.1

FURN

CRO 10-64

AEC

Prior Cost

DPWO

Prior Cost
TOTAL

lied

1.2

1,2

25.4

e534

90,5

91.7

COMPLETED
DESCRIPTION Engineering, procurement and construction for the rehabilitation of Building 7 were done by OICC, Mid Pacific, Pearl Harbor, Hawaii.
Original rehabilitation consisted of repairing and painting interior walls and partitions, replacement of asphalt tile, repair o: plumbing, restoration of latrine
fixtures on the first floor and replacement of a hot water boiler. (Completed in

1964.)

Additional rehabilitation included partitioning the open bays with partial dividers
to provide two-man cubicles for approximately 130 airmen. Venetian blinds or
blackout curtains were installed on the windows, and floor runners were installed
in the hallways. Each cubicle has been provided with individual clamp type lights
and two duplex convenience outlets. Rooms at the end of each main hall have been
completely enclosed and provided with doors. Electrical panels were reworked to
provide separate circuits for large bays, halls and latrine areas. Each of the
large bays was provided with individual master light switches. (Completed in
1965.)
Four commercial automatic clothes washers and three commercial dryers have
been procured and installed for use in the building.

DRAWINGS:

VOL II

JS 93-701-A} thru A3

7-38

JS 95-7-A2

Select target paragraph3