HICKAM
F&SNO.

07024
USER

Ceiinenmennety

AEB

SCIENTIFIC AND SUPPOR

TITLE

Monitoring for Flightline and Maintenance Crews
STRUCTURE FACILITY NO.

SCIENTIFIC STATION NO.

None

None

TG 8.4
FUNDING
AGENCY

JTF-8
MILCON

($000)

ENGR

PRE -GO
Prior Cost

PROC

6.0

CONST

4.2

BOD

Foo GO+45
TOTAL

FURN

10.2

CRO 10-64
POST-GO

Estimate 12/65
TOTAL

6.0

4.2

60.5

60.5

3.4

60.5

70.7

3.4

PRIOR YEARS

ENGINEERING Completed.
Drawings:

JS 95-029-Al thru A3

PROCUREMENT

JS 95-029-Cl and C2

JS 95-029-E1 and E2

A sewage pump, lavatories and urinals, anda 112.5 kva

transtormer have been procured.
POST -GO
ENGINEERING

Completed.

PROCUREMENT

To be completed.

CONSTRUCTION This facility, which will be used for the monitoring and
decontamination of sampler aircraft personnel, will be located east of the east
end of taxiway 7 within a 128 x 142-ft. paved area surrounded bya chain link
tence.
The facility will consist of two (2) standard eight man tents, a wash car and
three (3) trailers.

The tents will be wood-framed,

ridge height of 12 1/2-ft.

lo x 32-ft. in plan witha

The tents will be lighted and provided with 110 volt

convenience outlets.
The skid-mounted wash car, to be located between the tents, will be 8 x 24 x
ob 1/2-ft. high; will be provided with showers, water closets, urinals, and

sinks. A sewage lift station will dispose of waste from the wash car. A
waterline will be provided in the pump pit of the sewage lift station so that
the effluent from the showers can be diluted prior to being discharged into
the base sewer system.
Three (3)

10 x 52-ft.

trailers will also be located within the compound.

7-27

ise

VOL Il

we