ICKAM AEB
F &S NO.
07015
SCIENTIFIC AND SUPPORT
TITLE
Office and Conference Space
USER
STRUCTURE ‘FACILITY NO.
TG 8.4
SCIENTIFIC STATION NO.
Hangar T-3225
BOD
None
Building 3225
FUNDING
($000)
AGENCY
AEC
FOD
ENGR
PROC
CONST
TOTAL
68.5
21.3
426.7
516.5
0.3
0.3
FURN
PRE-GO
Prior Cost
JTEF-8
MILCON
CRO 7-67
52.8
PRE-GO
Prior Cost
TOTAL
68.5
21.3
427.0
516.8
52.8
COMPLETED
DESCRIPTION
Approximately 18,500 square feet of space within Hanyar T-3225
is available for various uses as follows:
USE
AREA
Office Space
300-Man Briefing Room
Shop Space (AF TAC)
Maintenance Space
Storage Space (flyaway and
10,000 square feet
5,000 square feet
800 square feet
700 square feet
aircraft support equipment}
Total:
This space
contines of
The new 97
Siding, and
2,000 square teet
18,500 square feet
was provided by erecting a new structure (Building 3225) within the
the existing hangar and by rehabilitating a lean-to within the hangar.
x 163-ft. building (completed in 1965) is wood-framed, has metal
built-up roofing. A 20 x 31 x 8-ft. high RF acoustically treated
screen room serves aS a communications center.
Latrine facilities are pro-
vided. Interior floor finish is exposed concrete except for the 300-man briefing room and the screen room which have asphalt tile tloors. Fluorescent
fixtures light the interior. To provide lighting in the event of power failure,
battery-powered emergency lights (with chargers) are mounted in the hallways
and larger offices of Building 3225. Convemence outlets of 110 volt capacity
are provided throughout the interior of the buiiding.
A 500 kva substation was constructed south of the building to meet the building's
120/208 volt, 60 cycle, 3 phase power demand. A 60 kw diesel generator located
west of the building serves as an emergency source of power for the command
post,
communications center, and air/ground radio room.
Transfer of power
is remote manual.
VOL IL
April 1969