‘ sah OAHU, DAMON TRACT F &S NO. TITLE 05007 Secure Trailer Compound and Trailers USER JTF FUNDING AGENCY AEC STRUCTURE /FACI LITY NO. r SCIENTIFIC AND SUPPORT SCIENTIFIC STATION NO. None BoD None ($000) ENGR PRE-GO Prior Cost PROC CONST TOTAL 21.7 28.0 321.4 371.1 FY-71 10.7 48.0 47.7 106.4 TOTAL 32.4 76.0 369.1 477.5 Foo GO+30 FURN 38.2 38.2 IN ORDER TO MEET THE REQUIRED FULL OCCUPANCY DATE OF GO + 30, ENGINEERING AND PROCUREMENT MUST BE ACCOMPLISHEDPRE-GO. PRIOR YEARS ENGINEERING Completed. Drawings: JS JS JS JS JS JS JS JS JS JS JS JS JS JS 95D-050-W2 95D-058-Al thru A3 95D-058-A5 thru Al7 95D-058-A19 95D-058-C3 thru C7 95D-058-Ml1 95D-058-M3 95D-058-El1 95-058. 2-Az 95-058-A4 thru Al3 95-058-A26 and A27 95-058-A31 95-058-A37 95-058.1-A/E2 JS 95-058-C3 JS 95-058-M2 JS 95-058-E14 JS 95-058-E3 and E4 JS 95-058-W3 and W4 JS 95-058-X1 JS 95-077-W7 thru W9 F 95D-058-A10 F 95D-002-Cl thru C3 F 95D-002-C5 F 95D-080-E] and E2 95-058-All 95-077-W6 and W7 PROCUREMENT Completed. CONSTRUCTION The Secure Trailer Compound is a partially paved 1.7 acrearea, enclosed by a grounded 8-ft. high chain link security fence. The fence is topped with barbed wire outriggers. Parking space for thirty (30) trailers is provided at the trailer dock within the compound (completed in 1965). A fresh waterline, sanitary sewer, telephone lines, and floodlights are provided. One personnel gate with a guardhouse situated nearby, and two (2) 20-ft. wide vehicle gates serve as access to the compound. 5-3 Ten-foot wide elevated wooden VOL II April 1969

Select target paragraph3