KAUAI AEC-TRE
F &S NO.
11013
USER
SANDIA
SCIENTIFIC
TITLE
Rocket Assembly Buildings
STRUCTURE. FACILITY NO.
Existing:
656 and 66)
Future:
Unnumbered
FUNDING
($000)
AGENCY
AEC
eee
ENGR
SCIENTIFIC STATION NO.
BoD
None
FOO GO+120
PROC
CONST
TOTAL
PRE-GO
Prior Cost
FY 71
6.3
12,0
159.7
114.0
* 166.0
126.0
TOTAL
18,3
273.7
292.0
FURN
PRIOR YEARS
ENGINEERING
Drawings:
Completed,
F 97-656-Al and A2
F
F
JS
JS
97-656-S1 and S2
97-656-E1
97-3224C -A2@ and A3
97-3224C -E6
PROCUREMENT
JS 97-656-Al
JS
JS
JS
JS
97-656-El
97-656-M1l
97-061-Al
97-6601-E}
F 97-661-Al and A2
F 97-661-E1l and E2
F 97-661-S1] and S2
F 97-661-Ml
97-3224B-S1
Completed.
CONSTRUCTION Two (2) Rocket Assembly Buildings (completed in 1965) are
36 x 38-ft. in plan with corrugated aluminum siding and roofing. The roofing
rests on wood purlins supported by intermediate steel trusses and wood end
walls. The trusses bear on timber columns tied into the wall framing.
The high bay assembly area is 30 x 36-it. 6-in. with a clear height of 12-ft.
o-in. An 8 x 36-ft. lean-to on the north side of the building has a clear height
of 8-ft. andis divided into an 8 x 8-ft. workroom and an 8 x 28-ft. office storage
area. The floor is a reinforced concrete slab which has been extended 20-ft.
out on the east and west sides of the building to form exterior flared loading
aprons 30-ft. wide.
The slab is designed to sustain a load of 2000 psi.
The insulated roofs and walls are paneled with gypsum wallboard.
bay area has four 8 x 8-ft. vehicle doorways.
The high
One 2 ton and one 3 ton chain hoist traverse the width of the high bay area,
one on each of two parallel monorails 12-ft. apart.
“Includes engineering's estimated distribution of cost gf $106.0Kfroml. D.
No. 13921.
11-9