Oishi
NASBARBERS POINT
F & 5 NO.
TITLE
10015
SUPPOR
Area Security Modifications
USER
STRUCTURE ‘FACILITY NO.
JTF
SCIENTIFIC STATION NO.
Various; see Text
FUNDING
AGENCY
($000)
AEC
ENGR
BoD
None
PROC
CONST
FOD
TOTAL
FURN
PRE-GO
Prior Cost
TOTAL
1.2
3.4
4.6
1.2
3.4
4.6
COMPLETED
DESCRIPTION
Control Center (Building 947)
The Control Center atop Building 947 is anair conditioned 10 x 10 x 8-ft. high
concrete block structurewithconcrete floor and roof slabs and an insulated built-
up roof. Access is via a ladder from ground level up through a trapdoor in the
floor. Bulletproof windows and gunports are provided on all sides. (Completed
in 1964.)
Surveillance of the entire assembly area is possible from the Control Center
except for a sector to the southwest whichis obstructed by Assembly Building
1082.
(Costs for this facility are included in F&S No. 09001--Assembly
Building).
Guardhouses 1683 and 1688
New counters and tables installed in Guardhouses 1683 (east of the Assembly
Building) and 1688 (in the Secure Trailer Compound) were arranged so the guard
could face the entry gate at all times while performing his duties. A new glasslouvered door and security corridor were also installed at each guardhouse. The
corridors, of 4-ft. high chain link fence extending from the gates to the guardhouses, prevent unauthorized wandering in the area by channeling personnel
directly to the guardhouses. (The costs for Guardhouse 1688 are included under
F&S No. 05013).
Additional Guardhouse
A 6 x 6-ft. skid-mounted guardhouse was placed at the southeast corner of the
road intersection west of the Secure Trailer Compound.
10-3
(Completed in 1966.)
VOL II