eee
HICKAM AFB
SCIENTIFIC AND SUPPORT
07023
Page
2
Remove existing partitions and construct new partition walls to form a
9x 12-ft. office anda 7 x 33-ft. darkroom.
Fabricate and install a platform 2-ft. 4-in. high and 33-ft. long inside
the darkroom.
In the center of the building, remove a 16 1/2 x 19-ft. portion of the
ceiling to provide installation space for the EG&G furnished processing
machine.
Provide new interior fluorescent lights.
Provide 40 kva,
120/208 volt,
60 cycle,
3 phase power by tieing into
an overhead power line.
Install a humidity controlled air conditioning system.
of 20-80% will be maintained.
A relative humidity
Install a 67 gallon hot water heater and associated plumbing to meet the
maximum of ten gallons per minute of 100°F water demanded by the developing machine.
Install a workbench,
Co
VOL II
storage cabinet, file, and miscellaneous furniture.
RRA
7-