e
i
h
HICKAM AFB
07018
PROCUREMENT
SCIENTIFIC AND SUPPORT
Page 3
Long lead items to be procured Pre-GO.
Only minor items
will be procured Post-Go.
CONSTRUCTION Approximately 1,000 sq. ft. of air conditioned computer and
data analysis space for Subtask A909 will be provided by modifying the interior
of Building 2060. Items of work to be accomplished include the modification of
the existing 750 kva substation, installation of a 500 kva transformer, air conditioning equipment, sprinkler system, anda raised tloor.
7-23
vot. tt
s
~