HICKAM AFB
SCIENTIFIC AND SUPPORT
F&SNO.
TITLE
07004
Laboratory Space
USER
STRUCTURE, FACILITY NO.
LASL&
SCIENTIFIC STATION NO.
T-3207 & T-3208
BoD
None
EG&G
FUNDING
AGENCY
AEC
FOO
($000)
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Prior Cost*
TOTAL
1.1
5.7
6.8
lel
5.7
6.8
COMPLETED
DESCRIPTION The original rehabilitation of Buildings T-3207 and T-3208 was
completed in 1964. Building T-3207 is used exclusively by LASL. Building
T-3208 is shared by LASL (east half) and EG&G (west half).
Rehabilitation of Building T-3207 consisted of rewiring, replacing two (2) wall
mounted air conditioning units, and installing a partition to provide a 19 x 23-ft.
office anda 19 x 29-ft. laboratory. Curtains were installed in the west end of
the building. The east end was rewired to provide 60 cycle and 400 cycle power.
The west half (EG&G portion) of Building T-3208 was partitioned to form a 14x
19-ft. office laboratory anda 91/2-x 19-ft. darkroom.
shelving and workbenches were installed.
painted and provided with workbenches.
Two (2) new doors,
The east half (LASL portion) was
Subsequent modifications to Building T-3208 included installation of a fresh
waterline and sewer connection to the photo waste disposal system. A roof
mounted exhaust fan and a new air conditioning system were also installed.
The source of incoming electrical power to the two buildings was changed from
that serving the Project Press quonset compound to that serving the trailer
park.
DRAWINGS:
JS 95-3207-Al
JS 95H-058-C6
JS 95H-058-E4
JS 95-3208-Al and Ml
F 95H-3208-E1
*Costs are applicable to modifications following original rehabilitation.
of original rehabilitation are included in F&S No. 07015. .
7-11
Costs
VOLII