facilition at RPG fer the upper wind project for the period
1B Wareh to 15 May 1954 was arranged with the Las Vegas Field
Office, USARS, Astien was also taken to inform tho Konager,

LV¥G, USAR that present requirements indicated no neod for the

reservation of fall parked private telephone circuits at Pa,
but the possibility of such a need should be a point for conpervaetive planning. A study of the Caummications Plan for HT
as drafted by the Las Vegas Field Office, USAR, and forwarded
by the Mavager, SPO, was made by the Coumanieations Officer,
SU, Coommts of this Directorate will be ferwarded to the
re SFO, USARG, tu early duly 1986,
dB. From 24 Yebruary to 16 May 1986, the Con' gunleations Offiear, DUET, was on TDY at the Pacifie Proving
@rounda. for duty with Task Unit 13 in Operation CASTLE. He
perferned the generel duties of project liaison officer with
the Raydist Radio Location System project and, in addition,
acted aa the designated field rapresentative of the Field Come

mand Contracting Officer relative *e the Raydist Contract

(Ko. DAnEOOMA~AE~968)
We

Nenctions,

,

“

pent vision. Due to the inter-raletionship of
she

Support

Division,

Dvet, and those of the

wea Detacieaxt (less radiclogioa) bafety) DMET, are eanbined and
Feperted heroin by subjest.’
.
‘de Supply = There deing neither a ZI tect operation
nor active preparation therefor during the period, supply actioe were generally ef & routine matures Activities worthy

nates

DOU Program and Project unita designated to
ecustitute CASTLE’Task Unit 235 were assisted in the inplemsrtation of certain logistical preparations such os the negotiation
of a priority contract with the Raydist Corporation for special
tracking devices,

be The Field Cemant property aocount at the
BPG, reéesigated as GP 1006 60 during this period, was inapected and given a satisfactory reting both by the Army Awiit
Ageusy and the Field Command Inepectar General, These inspections,
however, iudieated « substantial nusber of techniesl errors, As
& result, the property account was reorganized, rewarchoused ani
reinvantoried,
ree

oie Fkieeeees

ooeees
net

"

aedihaiihede

on

Select target paragraph3