Cost Eetanates. The items of = contemplated and the cost estimates are sumuerized
in the folloving tables:
Minimm Reqgiirements
ITER
ESTIMATED COS?
Le
Beachbead
3.
Access Chernel - 20' Beep
6.
Five (5) Earge Anchorages
2.
k.
5.
Te
8.
9.
12,000
Camp (as Fox-Redwing)
325,000
686,000
Conerete Station (As Station 70 - Redving)
300' Steel Tower (As Station 5- Redring)
295,000
343,000
Inter -Atoll Communications
243,000
—
Submarine Cable
Seadrane
TOTAL MINIMAL CONSTRUCTION
222,000
200,000
96,000
2,422,000
RECAPITULATION
Construction Equipment
471, 340
Operetionsl] Equipmen?
35,000
Construction Projects
2,422,000
TOLAL
2,928, 340
Maxizern Reoviremenuts
ITEM
ESTIMATED Cost
1.
2.
3.
Peechhesd
Camp - 200-Men
Airstrip
5.
3 Concrete Scations as Redvinz
4,
6.
T
8.
9.
10.
ll.
12.
13.
12,003
450,000
560, 000
Access Chenrsl - 20"
Pive (5) Barge Anchocages
Seadroame Facility
Ieter-Atoll Commmicuticns
Suttarine Cable
300' Steel Tover
Coserete Station (Redwing - Station 70)
Acesss Roeds and Causeways
Mole Type Pier
TOTAL CONSTRUCTION
686 , C02
1,013,000
222,000
96,000
243,000
613,000
343,000
295,000
180,000
98,000
4,811,000
RECLPITILATION
Construction Equipmass
1,022,510
Construction Project:
& 812,605
Operaticrnal Equimen:
50,000
TCTAL
@his is the end of the quotation from
EH
Task Group 7.5 report. }
Lan, Rr.
5,883,510