| 2) de yl Variance in the size of the maintenance force will, of course, vary the total cost and the AEC-DOD apportionment. No need was foreseen for changing the existing arrangement whereby the DOD pays transportation costs between CONUS, Hawaii and the EPG. p. Command and Control. If a future test organization is designated to report on a continucus basis to the DOD and the AEC, such an organization could exercise operational control over the EPG at all times. If a future test organization does not report on a continuing basis to the DOD and the AEC, control lines during the maintenance standby period would be AEC-ALOO-EPG for AEC elements and normal DOD command channels for DOD elements in the EPG. 4. CONCLUSIONS a. Consolidation of base camp activities on Eniwetok Island is the most efficient and least expensive method of conducting maintenance stand-by operations over a prolonged period in the EPG. b. Large economies can be realized through the consolidation of the AEC and DOD depots in the EPG. Further, consolidation of these depots is feasible and should be implemented. c. Mothballing of installed facilities and equipment on Parry Island should be accomplished and necessary modification to facilities on Eniwetok Island essential to the maintenance of the stand-by force remaining in the EPG should be accomplished. d. The requirement for continuation of the current heavy equipment maintenance program should be re-evaluated as soon as a decision is made to revise the current readiness objectives. Construction equip- ment excess to recomputed requirements should be disposed of. e. Scientific stations and associated equipment should be maintained in a mothball status for future test operations. f. The boat pool can be reduced in size to those numbers indicated in Tab "E" and the remainder stored at Pearl Harbor or otherwise dis. posed of, g. The requirement for locally based aircraft at Eniwetok cannot be justified; however, the requirement for emergency medical evacuation will continue. h. The airdrome at Eniwetok must remain operational and be manned to provide for twice-weekly MATS flights and such emergencies as may arise. ry i. The AEC contractor should assume the entire communications responsibility in the EPG. pe SECact ppfkeat® “

Select target paragraph3