COST AND CLEANUP METHODOLOGY
LOCATION
AREA(FT?)
METHOD
903 AREA
266,000
REMOVED TOP THREE $ 30,00
COST
INCHES INTO
CENTRAL AREA
1969
PAD
170,000
(903 AREA)
AREA COVERED WITH $100,000
10 INCHES FILL
MATERIAL AND 3
INCHES ASPHALT
1976
Lip
7,750
MANUAL EXCA-
$ 43,500
VATION IN
(903 AREA)
FLOORLESS BLDG,
1977
1978
POND-AREA
FRONT-END LOADER $327,000
(207 SOLAR
EXCAVATION OF
PONDS)
MOISTENED MATERIAL
OIL BURNING
PIT
1978
38,950
Lip
(903 AREA)
2,000
FRONT END Loaper $101,000
(5 Foot
EXCAVATION OF
DEEP)
MOISTENED SOIL
45,500
FRONT Enp Loader $410,000
EXCAVATION OF
MOISTENED SOIL