BLDG, NO.
541 -M
54° ~M
M
34,
544 -
545
546
548
15tv2got
2é,'x1201
Roefer Shelter
Cyvuerater Shed
Wood on Elevated Fdn.-Metal Roof
Storage
Tool Shed
Wood w/conerete floor
Metal
Wood with metal roof (Demolished)
Wood Frame w/corrugated metal
Wood on Wood Blocks
Wood Frame - Corrugated Metal covered
Wood & Corr. Metal, Wood Floor
Wood & Corrugated Metal
135 'x260!
100 'x150'
32%50!
Decontamination Fad
Decontamination Ped
Jet Deflector Pad
Wood & Corr, Metal on Skids
Conorete Sigb
2 Sided Wood Wall - Metal Roof
Slab
Concrete Slab
Concrete Slab
Concrete Slab
Conerete Fad
5000 bbl
5000 bbl
10,000 bbl
Storage Av-Gas
Storage, Jet Fuel
Tank, Steel,Welded, Vertical (f-2
Sand Blast Pad
15x25!
12'xi2t
200 tx300 1
tere
Wood Frame - Canvas Cover
Hot Locker Bldg.
Barber Shop
Air Force Mail Roon
Air Force Gym
16'x34!
8x32!
20 'x25!
TYE
Shed
Storage Shed
Paint Storage
24x26!
Ooo Q
564,
565
bso!
12'x20!
12 4x15!
Stx16!
547
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
Shek
12'x18'
7
» BE
Jet Warm Up Pad
Stobage, Av. Gas
10,000 bbl
Tank, Stecl,Welded, Vertical (T~1
Tank, SteelWelded, Vertical
‘
Gb G&Scages te RRR& Kat
ae
ional Archives
Reproduced from th
Pacific Southwest Region
(T-3
Storage, Jet Fuel
Tank, Steel,Welded,Vertical (T-4
&v-Gas Fill Stand
Steel Platform ~ Goncrete Pad
Steel Platform ~ Concrete Pad
Steel Platform - Conerete Pad
566
567
575
576
577
578
579
581
582
583
584
585
586
587
588
589
590
5A
592
593
3%,
595
5%
597
. Av-Gas Fill Stand
< Mo-Gas Fill Stand
%
F.
W.
Tank
ret enpeeerenereereetrtraerreteeens
569
570
571
572
573
574