KG ett tiie . AEE AE } Locat'on i eattinae S26 US AT Pe ENERGY COMMISSION ‘ F 23 Bl Collection J~3 Daily Diary . EVIVETOK Atoll J3-DDH-E99 1. 22 Nay 1958 411085 MISCET LANDOUS: eto ke = AS a resuit of measurements take: cf water wave ectivites which resuited’ from shots BUTTORNUT and WAHCC, Mr. Lou Kidd, Seripps Institute of Ccean- graphy, decided to re-evaluate the YELLC.CCD prediction shich was published in STG 7.1 letter, subject: "Prediction of Effects and Cperational Planning Raat fac LOrSe't, The original prediction cf .9 feet of water in 6C feet depth at Elmer and Fred was revised upward to 1.5 feet. This 1.5 feet will double and pcssibly become even greater as it approaches the shcreline. with YoLIC.G0D scheduled to be detonated at C630 hours and the high tide of 4.5 feet at 0632 inuurs, it appears that significant water wave action could result. s recomzendation was made that no ships or boats be moored to piers or beached from snot time till H+40 minutes, This timing was based on errival+ of the wave action in epproximately 25 minutes, Strong currents were precicted ao far as 400 feet off the lagoon shcreline. Permnrel were cautioned to .stay off the personnel pier till after the wave actions have ceased, These recoimenvations were passed at C&cC hours, 22 May, to Major Meehan (73 7.2), con Brown (TG 7.3) and Gene Claridge (T3 7.5). AFCAT=1 and Program 1 at Frace intvwrmed at 1115 and 1400 and they Loth say that they are sare. Ecb Pinnall and John Paolozzi both of TG 7.5 were alerted to the problem and were taking action to remove barge» from the slips, moor the boats in ceep never and remove material from the low areas. The analysis of the wave heisnts along the lagoon side of Elmer indicated that by starding at the shoreline and judging 32 to 4 feet raise of veter [ror the 3.1 tide line there are several areas that will receive some washing action. a TG 7.3 inplemented the aLove with a cable message to all ships and personnel (2121092), vol avery discussed SYCAMORE wave actions with Major Power at approximately 1715 hours, rt ~ FUELIS’TICNS: CLASSIFICATION CANCELLED BEST COPY AVAILABLE BY AUTHORITY,OF DOE/OC The following documents were published and distributed this date & 173C-JFZ Operetional Letter ASPEN - 1 -— Prediction of Effects and Operftional a 1733-JFE Cperational Letter MAGNCLIQ - 1 - Prediction of Effects 1743-JrS Transportation to Ex-WAHOC Terget Ships and Elements of the UMERUILA Planning Factors and Cperztional Planning Factors Target Array . 22 May 1958 22 May 1958 22 May 1958

Select target paragraph3