cUNS
QeOE nD
iten
Nuxber
Purpose
Situation
I
ir
Mit
Vehicles
Truck, 1/h Ten
148123
99
TG 7.1 Motor Pools
Truck, 2/4 Ton
10;
&
69
TG 7.1 Uoter Pools
Truck, 23 Ton
2; 20
12
TG 7.1 Motor Pools
Truck, 4 ton Pickup
23 28
&
TG 7.1 lotor Pools
Truck, Dscon
h
hk
@
TG 7.2 -ctor Pools
Truck, Tractor
3
3
2
TG 7.2 ictor Pools
HOTES z
1.
The above estimated requircterts neke no provision for udditional
ships to permit an aflost operation at RIXT!I since it is cortenpinted that
personnel will be abic to remain on ENYU fcr all shots.
In the evert personel
ard aircreft misu be evacuated, firing will cease at 3IKTII unless i.e ships at
TAONCI are utiliced ta maintain opereticns aficat.
If so, firings wuld then
cease at TACIICT,
2.
the recuirerents ate based on the assumptions incluced in this study.
Yor a specific oneration, they wold have to be restudicd and adjustments macs
accordingly.
3.
The above de not include the shins, craft or aircraft required b. any
ATSIP effects projects.
lk.
Abt TACHGT 44 is felt thet there should be two large ships, one of
which is capeble of hendling and providing at least miniraris meintonance
facilities for helicopters.