ae
JOHNSTON ATOLL
SCIENTIFIC
Page
01020
2
Explosion proof telephones have been installed in the screen room and Assembly
and Checkout Area.
The hydraulic shop is air conditioned.
compressed air to the building.
A TC-furnished air compressor provides
Protective berms have been constructed on three sides of the building with the
unprotected side facing the runway. (See F&S No. 02066.)
POST -GO
ENGINEERING
Completed.
PROCUREMENT
Procure chain link fence material.
CONSTRUCTION A 7-ft. high chain link security fence will be erected to enclose the building, adjacent stabilized areas and the protective berms. Two
400 cycle MG sets and an air compressor, TC-furnished, will be installed
adjacent to the building.
VOLI
1-24