JOHNSTON ATOLL
F &SNO.
01016
USER
Warheading Building
-
TC
SCIENTIFIC
TITLE
-
Subtasks Al01, Al04, A601 and A942
STRUCTURE FACILITY NO.
884
SCIENTIFIC STATION NO.
;
BOD
None
GO+90
FODGO+90
FUNDING
AGENCY
($000)
ITF -8
MILCON
PRE-GO
Prior Cost
CRO7-64
|POST-GO
ENGR
PROC
28.1
Estimate 3/67
TOTAL
28.1
CONST
TOTAL
FURN
224. 1
252.2
4.9
4,9
1.3
229.0
257.1
1.3
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
91-884-Al and Az
91-884-M1 and M2
91 -884-C]
91-884-S] and S2
91~-884-E1 and E2
91-884-W1 thru W4
PROCUREMENT
91-030-W2]
Completed.
CONSTRUCTION The Warheading Building is a concrete block structure 46 x 82
x 19-ft. high with a lightweight concrete roof.
The interior of the building is divided into four areas:
a.
The Subtask Al0l area is a 26 1/2 x 30-ft. screen room with an adjoining
12 x 28-ft. workroom. The workroom is equipped with a 4-ton monorail
which extends through 8 x 17-ft. exterior doors to 12~-ft. outside the building. Access to the screen room is through 8 x 10-ft. double doors opening
into the workroom.
b.
The Subtask Al04 area (approximately 30 x 33-ft.) consists of a screen
room which is accessible through 8 x 10~-ft. double doors in both the
screen room and the building exterior.
c.
The Subtask A601] area is a 16 1/2 x 30-ft. screen room with an adjoining
16 1/2 x 12-ft. unscreened workroom, which is equipped with a 4-ton monorail.
Access to the screen room is through 8 x 10-ft.
into the workroom.
VOLI
1-18
double doors opening