JOHNSTON ATOLL
cee een ee nn eee"BROGRAM 437
F&S NO.
TITLE
81013
Abe Laboratories
USER
igeaaTri LITY NO.
ADC
FUNDING
AGENCY
ADC
120*tE ast}
Boo
None
FOO.
($000)
ENGR
PROC
CONST
TOTAL
154.0
163.9
,
i‘0
FURN
PRE-GO
Prior Cost
JTF-8
PRE-GO
CRO 69-5
FY 69
SUBTOTAL
CRO4-66
SCIENTIFIC STATION NO,
9.9
Prior Cost
TOTAL
,
9.9
15.4
15.4
24.9
40.3
24.9
40.3
194.3
204, 2*
PRIOR YEARS
.
ae.
ENGINEERING Completed.
Drawings:
aa
oe zt 7 oS
91-120-M1 thru M5
JS 91-120-S100 and $102 thru $108
91-120-El] and E2
91-120-W1l
JS 91-120-M103 and M104
JS 91-120-E102, E103, E110 and
JS 91-120-A103 and A106
District File No. 105-10-1
E112
Sheets 21 and 22
PROCUREMENT Completed.
CONSTRUCTION The ADC Laboratory area occupies the east half (100 x 120-ft.}
of Building 120.
The space includes a Mechanical Maintenance Room, a Preclean
and LOX Clean Laboratory, a Hydraulics Laboratory, an Electrical Repair Clean
Laboratory, Calibration Laboratory, QC Room, Ozalid Reproduction Room,
Technical Library, Pragiston Measurements Equipment Laboratory (PMEL) Rooms,
Radio Maintenakee Roomy Television Room, Photography Laboratory, Parts Stor-
age, Latrine tandisifice-space.
Air conditioning equipment is located in a lean-to
iprm®of the building. An air compressor is housed in a shelter next
to the south
®. The air conditioning system is capable of providing the PMEL,
Calibration Laboratoryand "clean" areas with a closely controlled environments,
including temperature, humidity and dust particle control. Building 120 was
erected prior to 1960 and modified extensively at different times, particularly in
1964 and 1965, The outer walls are concrete block and the roof is corrugated
asbestos cement. The partition walls and ceilings are gypsum plasterboard over
wood framing. The wall between this ADC area and the cold storage plant oc-
cupying the west half of the building is concrete block and is insulated.
portion of the building is described under F&S No. 02081.
81-16
CRs
The west
VOL I
“pes