JOHNSTON ATOLL
F &SNO.
TITLE
USER
sTiaapaReFAS LITY NO.
04035
&Signal Cable
ett
SANDIA
None
FUNDING
($000)
AGENCY
AEC
ee
SCIENTIFIC STATION NO.
som. ss
None
ENGR
—-
PROC
CONST
|
EB
‘se
x
romeo>
TOTAL
FURR’
o
DO
PRE-GO
sy
Prior Cost
8.6
FY 69
2.5
FY 70
FY 71
SUBTOTAL
11.1
POST -GO
179.2
13.0
192.2
51.9
239.7
43.0
43.0
41.4
51.5 *
187.8
,
56.9
‘4
a
ane
51.5
391.1
Maa
2
Included in F&S Number 01003.
PRIOR YEARS
‘
aaa
re < e
ENGINEERING Completed.
PROCUREMENT Signal cable for 29 launch pads and interconnecting contyd
tions was procured and stored at Johnston Atoll.
pleted in 1968.
;
Rework of this cable was‘eom*® *
CONSTRUCTION Signal cable was installed to serve three launch pads, Scientific
Stations 91-4-23, 91-4-24 and 91-4-40 (completed in 1963). The launch pads are
described in F&S Number 01003. Cable was additionally installed from Building
660 to Building 720, 742, Transponder Tower and Wind Radar Trailers; from
Building 20 to Building 315; and from the Balloon Release Station to the Wind
Radar Trailers.
FY 1969
ENGINEERING Being accaqmplished for FY 70 installation.
pte
ae
To
PROCUREMER$:Being accomplished for FY 70 installation.
CONSTRUCTIOMESignal cable was installed to serve two HADlaunch pads, scien--.:.
tific Stations i= (-27 and 91-4-28, and one Universal launch pad, Scientific Station 91-4-44 (completed in 1968).
FY 1970
CONSTRUCTION Signal cable will be installed between Building 660 and Building 790, between Building 660 and Building 20, and between Building 660 and
Buildings 693, 714, 716, 720, 840 and Trailer G-7.
24
VOLI
April 1969