JOHNSTON
F&S NO.
ATOLL
02042
USER
SUPPORT
TITLE
Camp Operations Building
STRUCTURE FACILITY NO.
TG 8.6
SCIENTIFIC STATION NO.
512
BOD
None
Foo
FUNDING
AGENCY
AEC
($000)
:
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Prior Cost
55.0
55.0
TOTAL
55.0
55.0
COMPLETED
DESCRIPTION The Camp Operations Building (completed in 1964) is a 40 x 100ft. prefabricated steel frame structure, with corrugated aluminum siding and
roofing and a concrete floor. A portion of the building is now being used for
communications offices, anda shop area. The remainder of the building is
utilized to satisfy space requirements associated with camp operations. Present
planning indicates that the communications facilities will be moved to Building
316,
DRAWINGS:
JS 91-512-A100, Al0O1] and Al04
JS 91-512-M100
JS 91-512-E100
2-45
VOLI