7
JOHNSTON ATOLL
SCIENTIFIC
01056
Page
2
POST -GO
CONSTRUCTION Two battery type IV shop trailers will be located in an area
on the south side of the building and connected to the existing power outlets.
The two 400 cycle converters will also be installed.
1-55
VOL I