ei
JOHNSTON ATOLL
TITLE
F &SNO.
Field Maintenance Shop
01056
USER
STRUCTURE /FACILITY NO.
Subtask A942
BOD
SCIENTIFIC STATION NO.
None
ENGR
($000)
FUNDING
AGENCY
JTF -8
-
280
TC
MILCON
CRO 7-64
SCIENTIFIC
PRE-GO
Prior Cost
PROC
CONST
TOTAL
FURN
6.9
6.9
Construction costs are included in F&S No. 01004
POST-GO
Estimate 2/65
6.9
TOTAL
FOD GO+60
1.7
1.7
4.0
1.7
8.6
4.0
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
91-280-A] thru A3
91-280-E1 and E2
PROCUREMENT
91-280-S1
91-276-Cl
91-280-M1
91-276-E4
Completed
CONSTRUCTION This facility (completed in 1965) is a 40-ft. square prefabricated steel frame building with a clear inside height of 13-ft. The sides and
roof of the building are covered with corrugated asbestos cement and the building is erected ona5-~in. thick concrete floor slab. A 20 x 40-ft. area in the
north half of the building has been insulated and has a 12-ft. ceiling height.
This enclosure is the Guidance Area and storeroom andis air conditioned to
provide a temperature of 70° + 5°. The other half of the building is used as
office and shop area and has latrine facilities. A 12x 13-ft. high sliding door
is located at each end of the office and shop area.
Interior lighting provides 50 foot-candles at bench level. Two (2) foot-candles
of exterior lighting is provided on all four sides of the building.
Receptacles have been installed to provide 3 kw,
two Post-GO trailers.
120 volt, 60 cycle power for
Two 400 cycle converters have been furnished by AMICOM for Post-GO installa -
tion at this facility.
One converter will provide 400 cycle power to the two battery
trailers. The second converter will provide 400 cycle power to duplex outlets
located in the Guidance area.
A 13-ft. high coral berm has been constructed on the south and east sides of
the building (see F&S No. 02066).
VOLI
1-54