JOHNSTON
F&SNO.
01041
USER
ATOLL
,
Modification of Optical Station
STRUCTURE/FACILITY NO.
LASL
EG&G
.
SCIENTIFIC STATION NO.
93/94
Bop
91-1-1 (Building 94)
FOD 9/1/70
FUNDING
AGENCY
AEC
SCIENTLIEILC
TITLE
($000)
ENGR
PRE-GO
Prior Cost
FY 69
PROC
16.5
7.8
FY 70
CONST
45.7
84.4
FY 71
TOTAL
108.7
45.7
TOTAL
31.4
93.6
7.8
340.7
425.1
531.1
531.1
903.2
1057.6
FURN
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
91-93-Cl
91-94-Cl and Ca
91-93-S1
91-93-WIl
91-94-Al and AZ
91-94-S1.
91~93-Ml and M2
91-93-El and E2
91-94-M1 and M2
91-94-E1 and E2
JS 91-93-E100
PROCUREMENT
Completed.
91-94-Wl
Astrodome required for Post-GO installation has.
been purchased and is currently stored at Damon Tract.
Electrical and mechanical
equipment and other long lead time items have been procured.
CONSTRUCTION
Pre-GO construction is complete and includes installation of
the retaining wall and fill, relocation of the 16-in. saltwater line, relocation of
Personnel Bunker and demolition of Hardtack Personnel Shelter.
FY 69, 70 and 71
THE FOLLOWING DESCRIPTION OF WORK TO BE ACCOMPLISHED IS BASED
UPON PRELIMINARY CRITERIA. FISCAL INFORMATION SHOWN IS FOR
PLANNING PURPOSES ONLY; HOWEVER $7800 HAS BEEN AUTHORIZED FOR
ENGINEERING IN FY 1969.
ENGINEERING
To be accomplished.
PROCUREMENT
To be accomplished.