HOLMES @ NARVER,
INC
ENGINEERS - CONSTRUCTORS
JOB 942
NAME OF STATION
OF
TRIANGULATION
GAIL
CHIEF OF, PARTY .H. mM. Johnson
DESCRIBEO BYW. Creasman MARKED Hy
Do
.
Gail
‘Elgin
| Buck #1
DETAILED
Pacific Southwest
4.52
00-00-00
|
32427-24
a
—_——
8.15.
|
|
/
3
32-27~24
DESCRIPTION
4.52
OF
9,23
Bd
STATION
.
This station was established as a second order triangulation station in the
Atoll Control Net by the Holmes & Narver 1957 Replacement Survey to replace
triangulation Station GENE which was destroyed during Operation Redwing.
This station is located approximately at the center of the &sland and 125 feet
from the lagoon high tide line.
The station mark is a standard H & N brass cap set in a conorete filled 55
gallon drum encasing the top of a 10" H-pile.
1957."
It is stamped "Gail - H & N -
The mark is 6" below the ground surface.
This station is the western end of the "Gene-Helen-Irene" first order traverse.
Bucks #1 and #2 are 4"x4" posts set in concrete with a punched aluminum strip
fastened to the top.
The Strips are stamped with the buck number.
PRUNES EY BIRD BO
R
oT
fy
ah
wide
J 4
|
a
Oo
OF MARK.
Teiteiripucchi Island
Eniwetok Atoll
TO REFERENCE MARKS
DIRECTION
1 ELEVATION
ae
ELEVAT!ON
he National Arch
Reproduced fro m.the holdings of tt ion
Reg
SH Nae
ms,
>
| 328.07
Gene
Marshall Islands
5/14/57
> METERS ~
to
—164.04 |
Burk #2
de.
,
H.M.Jd.
DISTANCES AND DIRECTICNS
UBJECT
i
OISTANCE
;
‘FEET
|
DATE
PAGE.
FIELO SOOK NO
SITE
STATION
eee oltl
‘
DESCRIPTION