Number
Situation
I Ir Ir
Purpose
“Vehicles
Truck, 1/4 Ton
148123
99
TG 7.1 Motor Pools
truck, 3/k Ton
toh 8
69
TG 7.1 Moter Pools
Truck, 23 Ton
2) 20
12
TC 7.1 Motor Pools
8 28
®
TG 7.1 Yoter Pools
Truck, % ton Pickup
/
Truck, Decon
y
&
k
2
TG 7.1 -oter Pools
Truck, Tractor
/
3
3
2
TG 7.2 iietor Pools
HOTES s
le
The above ostimated requirments make no provision for udditional
ships to permit an afloat operation at BIKINI since it is contemplated that
personnel will be able to remain on ENYU for al shots, In the event personnel
and aircraft must be evacuated, firing will cease at BIKINI unless the ships at
TAONGI are utilized to maintain operations afloat,
cease at TAONGI,
2.
If so, firings wuld then
.
The requirerents are based on the assumptions included in this study,
For a specific operation, they would have to be restudied and adjustments made
accordingly.
3.
The above do not include the ships, craft or atreraft required b,° any
AFSWP effects projects.
ke
At TAONGT it is felt that there should be two large ships, one of
which is capable of handling and providing at least minimm meintensnce
ay
facilities for helicopters.
me
-
=
a