photographic aircraft missions, compilation of mission data and
monitoring of drone aircraft ground maintenance operations following
the return of drone aircraft to Kwajalein on X-ray Day plus five,
During a visit to Kwajalein on 24 April, Col Cooney gave an
informal talk to TU 7.6.1 at which time he gave a summary of the
results obtained on X-ray Day and stated some of the problems anti8 Som
cipated for Yoke operations.
wae
A final critique of the X-ray test showed that the overall
operation of TU 7.6.1 had been very goog.
The one flaw was that post
X-ray Day operations were somewhat disorganized because of unexpected
missions which came up.
To correct this all monitors were given post
mission day assignments for Yoke and Zebra tests.
YOKE TEST
Yoke test operations were carried out:3fthe same manner and on
the same approximate time schedule as for X-ray test.
Several
additional missions were flown in connection with the operation and
TU 7.6.1 personnel were pushed to the limit of physical endurance to
maintain their operations schedules.
DELETED
AEA Restricted Data
All operations in connection with the Yoke test were completed
by Yoke plus nine and preparations were completed for the Zebra test
very shortlythereafter.