ae. PRIVACY ACT MATERIAL REMOVED enter an area where the radiation intensity was greater than 100 or/hr. Other tasks-in connection with the tests consisted of drone aircraft monitoring and decontamination operations at Eniwetok, aircraft monitoring and personnel decontamination operations at Kwajalein, cloud tracking operations until H plus 108 hours, instrument maintenance and recalibration operations, preparation of medical dosimetric records and compilation of mission reports, Each monitor completed an average of two training flights with his assigned crew prior to Peter X~ray Day. The flights were extremely valuable in that each monitor was able to work out radiological safety procedures that, while adequate, would not hamper the primary mission. Instrument performance data began to beaccumilated and as a result of these data considerable changes became necessary in instrumentation procedures, Initial practice missions showed that altitudes of 10,000' or higher had a definite effect on ion chanber type instruments. In general all ion chamber instruments, except the Beckman MX-6 Gamma Survey Meter which had a sealed case, failed due to rupture of the ion chamber. This problem was solved by modificationof the instruments to include an air hole in the chamber and by calibration of the instrument at the altitude for which it was to be used. Capt AMMs designed and supervised construction of an experimental instrument pressure tank which operated off the radar pressurizing system of a B-17 aircraft. Tests showed this tank to be excellent and instruments could be used in it without air calibration. Section Ix 99 PRIVACY ACT MATERIAL REMOVED ps

Select target paragraph3