(1)
During this period the Battalion Supply Officer with
the help of the Technical Supply Officers of the
various supply teams prepared requisitions for all
‘supplies to be loaded aboard the LST's 45, 219, 611
and 1135 and the USAT Coastal Crusader.
(2)
The Technical Service Depots located on Oahu were
charged with the responsibility of delivering sup~
plies and equipment to the designated loading points.
(3)
Loading points for supplied to be loaded aboard the
LST's was Iroquois Point.
Those for the Coastal
Crusader, Victor Pier #5 at Pearl City.
c.
General Breakdown of Supplies to be Loaded Aboard each
Vessel was:
(1)
LST 45 = Total Ship Tons 1829
This included:
Vehicles, contractor's list of
supplies and equipment; 18th Engineer equipment;
three lists of Navy supplies, i.e., distillation
units, generators and miscellaneous utilities supplies.
(2)
LST 219 - Total Ship Tons 846
This included:
2 vehicles and 125 miscellaneous
boxes of automotive maintenance and signal supplies.
(3)
LST 611 ~ Total Ship Tons 1564
This included:
Vehicles, equipment and supplies
of the 18th Engineer Construction Company.
Section Vi~-a
33